Demand Driven MRP – The need to standardise an implementation process.

  1. Orue, A. 1
  2. Lizarralde, A. 1
  3. Kortabarria, A. 1
  1. 1 Escuela Politécnica Superior de Mondragon Unibertsitatea
Revista:
International Journal of Production Management and Engineering (IJPME)

ISSN: 2340-4876 2340-5317

Año de publicación: 2020

Volumen: 8

Número: 2

Páginas: 65-73

Tipo: Artículo

DOI: 10.4995/IJPME.2020.12737 DIALNET GOOGLE SCHOLAR lock_openAcceso abierto editor

Otras publicaciones en: International Journal of Production Management and Engineering (IJPME)

Objetivos de desarrollo sostenible

Resumen

Since the creation of the demand-driven material requirement planning (DDMRP) model, numerous studies have analysed the methodology’s significant impact on different organisations. Several successful cases and research studies into DDMRP have demonstrated that the methodology is beneficial to organisations because it increases their service level and stock adjustments; however, there is a dearth of literature regarding the steps necessary to implement this model successfully. This document delivers a systematic review of the literature based on the work done by Kitchenham (2004) with the aim of analysing studies that investigate the standardization of the process of implementing the model. Once the lack of research has been demonstrated, a possible line of future research can be outlined to standardise the implementation process of the DDMRP model to achieve its full potential.

Referencias bibliográficas

  • Bahu, B., Bironneau, L., Hovelaque, V. (2019). Compréhension du DDMRP et de son adoption: Premiers éléments empiriques. Logistique & Management, 1–13. https://doi.org/10.1080/12507970.2018.1547130
  • De La Calle, A., Grus, M.E., Álvarez, E. (2017). Value creation through demand and supply chains: Evidences from Spanish companies. Direccion y Organizacion, 61, 4–11.
  • Dessevre, G., Martin, G., Pellerin, R., Lamothe, J., Lauras, M. (2019). Decoupled Lead Time in finite capacity flowshop: A feedback loop approach. 2019 International Conference on Industrial Engineering and Systems Management (IESM), 1–6. https://doi.org/10.1109/IESM45758.2019.8948198
  • Favaretto, D., Marin, A. (2018). An Empirical Comparison Study Between DDMRP and MRP in Material Management. SSRN Electronic Journal. https://doi.org/10.2139/ssrn.3305114
  • Fomin, V., Lyytinen, K. (2000). How to Distribute a Cake before Cutting It into Pieces: Alice in Wonderland or Radio Engineers' Gang in the Nordic Countries?. In Jakobs, K. (Ed.), Information Technology Standards and Standardization: A Global Perspective (pp. 222-239). IGI Global. https://doi.org/10.4018/978-1-878289-70-4.ch014
  • Gupta, M.C., Boyd, L.H. (2008). Theory of constraints: A theory for operations management. International Journal of Operations & Production Management, 28(10), 991–1012. https://doi.org/10.1108/01443570810903122
  • Ihme, M., Stratton, R. (2015). Evaluating Demand Driven MRP: A case based simulated study. In International Conference of the European Operations Management Association (1–10). Retrieved from http://irep.ntu.ac.uk/id/eprint/26668/
  • ISO, I. S. O. (2005). 9000-Quality management systems—Fundamentals and vocabulary. Quality Management Systems, Berlin: Beuth Verlag GmbH, 22–25.
  • Jang, Y., Lee, J. (1998). Factors influencing the success of management consulting projects. International Journal of Project Management, 16(2), 67–72. https://doi.org/10.1016/S0263-7863(97)00005-7
  • Jiang, J., Rim, S.C.C. (2017). Strategic WIP Inventory Positioning for Make-to-Order Production with Stochastic Processing Times. Mathematical Problems in Engineering, 2017, 1–7. https://doi.org/10.1155/2017/8635979
  • Jiang, J., Rim, S. C. (2016). Strategic Inventory Positioning in BOM with Multiple Parents Using ASR Lead Time. Mathematical Problems in Engineering, 2016, 1–9. https://doi.org/10.1155/2016/9328371
  • Kitchenham, B. (2004). Procedures for performing systematic reviews. Keele, UK, Keele University.
  • Koren, Y. (2010). The global manufacturing revolution: product-process-business integration and reconfigurable systems (Vol. 80). John Wiley & Sons. https://doi.org/10.1002/9780470618813
  • Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I. (2018). Material management without forecasting: From MRP to demand driven MRP. Journal of Industrial Engineering and Management, 11(4), 632. https://doi.org/10.3926/jiem.2654
  • Lee, C.J., Rim, S.C. (2019). A Mathematical Safety Stock Model for DDMRP Inventory Replenishment. Mathematical Problems in Engineering, 2019, 1–10. https://doi.org/10.1155/2019/6496309
  • Lizarralde, A., Apaolaza, U., Mediavilla, M. (2020). A Strategic Approach for Bottleneck Identification in Make-to-Order Environments: A Drum-Buffer-Rope Action Research Based Case Study. Journal of Industrial Engineering and Management, 13(1), 18–37. https://doi.org/10.3926/jiem.2868
  • Martin, G., Baptiste, P., Lamothe, J., Miclo, R., Lauras, M., & Albi, M. (2018). A process map for the Demand Driven Adaptive Enterprise model: Towards an explicit cartography 3. The cartography: how to represent the complete Demand Driven Adaptive. In 7 th International Conference on Information Systems, Logistics and Supply Chain (664–672). Retrieved from https://hal-mines-albi.archives-ouvertes.fr/hal-01883504/
  • Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016a). An empirical comparison of MRPII and Demand-Driven MRP. IFACPapersOnLine, 49(12), 1725–1730. https://doi.org/10.1016/j.ifacol.2016.07.831
  • Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016b). MRP vs. Demand-driven MRP: Towards an objective comparison. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1072–1080. https://doi.org/10.1109/IESM.2015.7380288
  • Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A. (2019). Demand Driven MRP: Assessment of a new approach to materials management. International Journal of Production Research, 57(1), 166–181. https://doi.org/10.1080/00207543.2018.1464230
  • Münstermann, B., Weitzel, T. (2008). What Is Process Standardization? (Vol. 64). Retrieved from http://aisel.aisnet.org/confirm2008/64
  • Pretorius, P. (2014). Introducing in-between decision points to TOC ’ s five focusing steps. International Journal of Production Research, (November), 37–41. https://doi.org/10.1080/00207543.2013.836612
  • Ptak, C.A., Smith, C. (2016). Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Incorporated.
  • Ramakumar, A., Quality, B.C. (2004), U. (n.d.). Process standardization proves profitable: the demand for higher product quality has resulted in an increasingly complex value chain. BNP Media. Retrieved from https://scholar.google.es/scholar?hl=es&as_sdt=0%2C5&q=ramakumar+y+cooper+2004&btnG=
  • Shofa, M.J., Moeis, A.O., Restiana, N. (2018). Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP. In IOP Conference Series: Materials Science and Engineering (Vol. 337, p. 012055). IOP Publishing. https://doi.org/10.1088/1757-899X/337/1/012055
  • Shofa, M.J., Widyarto, W.O. (2017). Effective production control in an automotive industry: MRP vs. demand-driven MRP. In AIP Conference Proceedings (Vol. 1855, p. 020004). AIP Publishing LLC. https://doi.org/10.1097/01.ju.0000143904.17666.0b
  • Smith, B.D., Smith, C. (2013, November 1). Becoming demand-driven: How to change from push and promote to position and pull. Strategic Finance, 95(November), 37–45. Retrieved from https://go.galegroup.com/ps/i.do?p=AONE&sw=w&u=googlescholar&v=2.1&it=r&id=GALE%7CA349741171&sid=googleScholar&asid=052f118f
  • Stevenson, M., Hendry, L.C., Kingsman, B.G. (2005). A review of production planning and control: The applicability of key concepts to the maketo-order industry. International Journal of Production Research, 43(5), 869–898. https://doi.org/10.1080/0020754042000298520
  • Swaminathan, J.M. (2001). Enabling Customization Using Standardized Operations. California Management Review, 43(3), 125–135. https://doi.org/10.2307/41166092
  • Trojan, J., Pekarčíková, M., Kliment, M., Trebuňa, P. (2019). Demand driven material requirements planning. Some methodical and practical comments. Management and Production Engineering Review, 10(2), 50–59. https://doi.org/10.24425/mper.2019.129568
  • Velasco Acosta, A.P., Mascle, C., Baptiste, P. (2019). Applicability of Demand-Driven MRP in a complex manufacturing environment. International Journal of Production Research, 0(0), 1–13. https://doi.org/10.1080/00207543.2019.1650978