Analysis of order promising process in BTF products with high variability and long manufacturing lead times application to a machine-tool manufacturer

  1. Saiz, E.
  2. Castellano, E.
  3. Besga, J.M.
  4. Sanchis, R.
Actas:
IFAC Proceedings Volumes (IFAC-PapersOnline)

ISSN: 1474-6670

ISBN: 9783902823359

Ano de publicación: 2013

Volume: 46

Número: 9

Páxinas: 694-699

Tipo: Achega congreso

DOI: 10.3182/20130619-3-RU-3018.00584 GOOGLE SCHOLAR

Obxectivos de Desenvolvemento Sustentable