Material management without forecastingFrom MRP to demand driven MRP

  1. Alaitz Kortabarria
  2. Unai Apaolaza Pérez de Eulate
  3. Aitor Lizarralde Aiastui
  4. Itxaso Amorrortu Gervasio
Revista:
Journal of Industrial Engineering and Management

ISSN: 2013-0953

Año de publicación: 2018

Volumen: 11

Número: 4

Páginas: 632-650

Tipo: Artículo

DOI: 10.3926/JIEM.2654 DIALNET GOOGLE SCHOLAR lock_openAcceso abierto editor

Otras publicaciones en: Journal of Industrial Engineering and Management

Objetivos de desarrollo sostenible

Resumen

Purpose: Efficient Operations and Supply Chain Management is key to building sustainable competitive edge for companies. However, the achievement of this goal is becoming challenging in the present dynamic production environment, as traditional Manufacturing Planning and Control systems were not developed to work in this context. The Demand-Driven Material Requirement Planning (DDMRP) methodology was developed with the aim of addressing this need and deal efficiently with material management. The present work, therefore analyzes the evolution of a company after converting from MRP to DDMRP.Design/methodology/approach: To achieve an in depth understanding of the case study a qualitative approach was taken. Data was collected from semi-structured interviews, documents and archival records enabling triangulation. The results from before and after the implementation of DDMRP were compared, and the evolution of the performance of the company was evaluated.Findings: The results clearly show that using DDMRP the company increased visibility in the supply chain. In addition, the inventory level was reduced by 52.53% while material consumption was increased by 8.7%. These results were achieved while maintaining the high service level.Originality/value: DDMRP is a relatively new methodology and for this reason there is little published data in this field. In addition the few studies found in the literature analyze the performance of DDMRP in simulated environments. The present work aims to go one step further and analyzes the implementation of DDMRP in a real company.